2004 – 2005 COMPLETED PROJECTS
The following are some of the major projects completed in the Generation Division:
Cabras 1&2 Power Plant (2004-2005)
- Completed Turbine/Generator Overhaul on both units
- Performed Boiler Chemical Cleaning (Electro-deionization) on both units
- Performed Boiler Condition Assessment on both units
- Replaced Deaerator Storage Tanks for both units
- Replaced Air Preheater Baskets on both units
- Retubed HP Feedwater Heater (#5) on Unit #1
- Refurbished/Replaced Boiler Safety Valves on both Units
- Replace Turbine Deck Exhaust Fans
- Refurbished Force Draft Fans (Venturi, Motor, Rotor) on both units
- Assessed and Adjusted Boiler Springs & Hangers
- Completed Cabras Unit #2 Turbine Overhaul
- Replaced Boiler Drum level indicators
- Replaced the Start-Up Transformer
- Conducted training for Operations & Maintenance personnel
- Conducted annual performance testing
- Completed boiler section replacements (Arch Tube, Reheat Tubes)
- Installed Turbine Lube Oil Purifier
- Replaced corroded cable trays in basement
- Installed fire retardant on boiler front cables
- Replaced Chemical Feed System
- Installed water sampling system
- Constructed roof over Waste Oil Facility oil water separator
- Replaced one instrument/service Air Compressor
Cabras 3&4 Power Plant (2004-2005)
- Modified Scavenging Air Drain / Mist Catcher
- Initiated Fuel Oil Supply and Return line replacements
- Replaced Traveling Screen Control Panels
- Initiated Piston Clean Ring Modification (extends liner operation cycle)
- Initiated Design for 750KW emergency generator installation (90% Complete)
- Constructed building to house Fuel Oil Day Tank Heater Panels
- Modified Exhaust Gas Receiver piping elbows (minimize leaks)
- Upgraded Turbocharger Silencers with stainless steel wire mesh on Unit #3
- Replace Homogenizer control panel
CT & Diesel Plants (2004 – 2005)
- Completed Major OH for Manenggon Diesel units (5MW x 2 Units)
- Replace Air Compressors at the Manenggon and Tenjo Vista Power Stations
- Stack Replacement at the Talofofo Power Plant
- Completed Dededo CT #1 Major Overhaul
- Completed Repairs & Major Overhaul work on Macheche CT Unit
- Completed Rotable Assembly Exchange/Repair Yigo CT
- Purchased water softeners for Macheche and Yigo CT
|