2004 – 2005 COMPLETED PROJECTS

The following are some of the major projects completed in the Generation Division:

Cabras 1&2 Power Plant (2004-2005)

  • Completed Turbine/Generator Overhaul on both units
  • Performed Boiler Chemical Cleaning (Electro-deionization) on both units
  • Performed Boiler Condition Assessment on both units
  • Replaced Deaerator Storage Tanks for both units
  • Replaced Air Preheater Baskets on both units
  • Retubed HP Feedwater Heater (#5) on Unit #1
  • Refurbished/Replaced Boiler Safety Valves on both Units
  • Replace Turbine Deck Exhaust Fans
  • Refurbished Force Draft Fans (Venturi, Motor, Rotor) on both units
  • Assessed and Adjusted Boiler Springs & Hangers
  • Completed Cabras Unit #2 Turbine Overhaul
  • Replaced Boiler Drum level indicators
  • Replaced the Start-Up Transformer
  • Conducted training for Operations & Maintenance personnel
  • Conducted annual performance testing
  • Completed boiler section replacements (Arch Tube, Reheat Tubes)
  • Installed Turbine Lube Oil Purifier
  • Replaced corroded cable trays in basement
  • Installed fire retardant on boiler front cables
  • Replaced Chemical Feed System
  • Installed water sampling system
  • Constructed roof over Waste Oil Facility oil water separator
  • Replaced one instrument/service Air Compressor

Cabras 3&4 Power Plant (2004-2005)

  • Modified Scavenging Air Drain / Mist Catcher
  • Initiated Fuel Oil Supply and Return line replacements
  • Replaced Traveling Screen Control Panels
  • Initiated Piston Clean Ring Modification (extends liner operation cycle)
  • Initiated Design for 750KW emergency generator installation (90% Complete)
  • Constructed building to house Fuel Oil Day Tank Heater Panels
  • Modified Exhaust Gas Receiver piping elbows (minimize leaks)
  • Upgraded Turbocharger Silencers with stainless steel wire mesh on Unit #3
  • Replace Homogenizer control panel

CT & Diesel Plants (2004 – 2005)

  • Completed Major OH for Manenggon Diesel units (5MW x 2 Units)
  • Replace Air Compressors at the Manenggon and Tenjo Vista Power Stations
  • Stack Replacement at the Talofofo Power Plant
  • Completed Dededo CT #1 Major Overhaul
  • Completed Repairs & Major Overhaul work on Macheche CT Unit
  • Completed Rotable Assembly Exchange/Repair Yigo CT