Protecting our environment is an important responsibility to the Guam Power Authority. We are governed by and compy with the following:
CLEAN AIR ACT
- Prevention of Significant Deterioration (PSD)
- Annual Emission Testing
- Continuous Emissions Monitoring System (CEMS) – including Relative Accuracy Test Audit (RATA Testing) and Cylinder Gas Audit (CGA)
- Annual Emission Inventory / Fees
- New Source Performance Standards (NSPS Reporting)
- CPAICS (Fuel Switching)
- Cabras-Piti Area, Intermittent Control Strategy [40 CFR 69.11 and 69.12]
- Establishes the rules and procedures governing the regulation of fuel switching at the Cabras Power Plant and Piti Power Plant.
- Fuel Switching requirements are implemented. In compliance with all reporting requirements.
- Quarterly Reports are sent to U.S. EPA and must be postmarked/mailed within 30 days of the end of the Quarter
- Guam EPA Air Permits Compliance
- Title V Air Permit Program
CLEAN WATER ACT
- Cabras NPDES Permit Compliance
- 316(b) Study Phase I
- 316(b) Study Phase II
- Effluent Discharge Monitoring
- Discharge Monitoring Report (DMR)
- Toxicity Testing
- Best Management Plan (BMP)
- Annual Chemical Usage Report
- Spill Prevention Control and Countermeasures Plan (SPCC Plan) Compliance
- Revision of SPCC Plans to comply with changes in regulations
- Emergency Spill Response Program in place – Response to any spill within one hour
- Oil Pollution Prevention Regulation
RESOURCE CONSERVATION & RECOVERY ACT (RCRA) “RiCRA”
- Solid/Hazardous Waste Management Program
- Used Oil Recycling Act
TOXIC SUBSTANCE CONTROL ACT (TSCA) “TaSCA”
- PCB Management Program
- Asbestos Operation and Maintenance (O&M) Plan
ENVIRONMENTAL PLANNING AND COMMUNITY RIGHT-TO-KNOW ACT (EPCRA)
Annual Chemical Inventory/Usage and Reporting Requirements – annual Toxic Release Inventory Report (TRI)
COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT (CERCLA and SUPERFUND) Oil spill emergency response and clean-up for all GPA facilities and islandwide.
CRITICAL ENVIRONMENTAL COMPLIANCE ACTIVITIES
- Unilateral Administrative Order For Piti Tank Farm - USEPA Docket CWA-9-2001-001 – Life extension and upgrade of Tanks 1934 and 1935 plus Oil/Water Separator.
- Consent Decree Civil No. 97-00030 (Fuel Switching) - Cabras/Piti Intermittent Control Strategy
- Tanguisson Pipeline Maintenance - Tanguisson Pipeline inspections, repairs, upgrade of pipeline, pipeline supports, rectifiers, etc. Repair and upgrade of pipeline is ongoing.
|