2004 – 2005 COMPLETED PROJECTS

The following are some of the major projects completed in the Generation Division:

Cabras 1&2 Power Plant (2004-2005)

  • Completed Turbine/Generator Overhaul on both units
  • Performed Boiler Chemical Cleaning (Electro-deionization) on both units
  • Performed Boiler Condition Assessment on both units
  • Replaced Deaerator Storage Tanks for both units
  • Replaced Air Preheater Baskets on both units
  • Retubed HP Feedwater Heater (#5) on Unit #1
  • Refurbished/Replaced Boiler Safety Valves on both Units
  • Replace Turbine Deck Exhaust Fans
  • Refurbished Force Draft Fans (Venturi, Motor, Rotor) on both units
  • Assessed and Adjusted Boiler Springs & Hangers
  • Completed Cabras Unit #2 Turbine Overhaul
  • Replaced Boiler Drum level indicators
  • Replaced the Start-Up Transformer
  • Conducted training for Operations & Maintenance personnel
  • Conducted annual performance testing
  • Completed boiler section replacements (Arch Tube, Reheat Tubes)
  • Installed Turbine Lube Oil Purifier
  • Replaced corroded cable trays in basement
  • Installed fire retardant on boiler front cables
  • Replaced Chemical Feed System
  • Installed water sampling system
  • Constructed roof over Waste Oil Facility oil water separator
  • Replaced one instrument/service Air Compressor
Cabras 3&4 Power Plant (2004-2005)
  • Modified Scavenging Air Drain / Mist Catcher
  • Initiated Fuel Oil Supply and Return line replacements
  • Replaced Traveling Screen Control Panels
  • Initiated Piston Clean Ring Modification (extends liner operation cycle)
  • Initiated Design for 750KW emergency generator installation (90% Complete)
  • Constructed building to house Fuel Oil Day Tank Heater Panels
  • Modified Exhaust Gas Receiver piping elbows (minimize leaks)
  • Upgraded Turbocharger Silencers with stainless steel wire mesh on Unit #3
  • Replace Homogenizer control panel
CT & Diesel Plants (2004 – 2005)
  • Completed Major OH for Manenggon Diesel units (5MW x 2 Units)
  • Replace Air Compressors at the Manenggon and Tenjo Vista Power Stations
  • Stack Replacement at the Talofofo Power Plant
  • Completed Dededo CT #1 Major Overhaul
  • Completed Repairs & Major Overhaul work on Macheche CT Unit
  • Completed Rotable Assembly Exchange/Repair Yigo CT
  • Purchased water softeners for Macheche and Yigo CT

Mobile Devices
Get the latest news, outages. Or contact us from your mobile phone.

Find Out More
Future Planning
GPA is working hard to insure a bright future for the people of Guam in several areas.

Find out More
Watts New
All about the issues affecting your electrical service.


Get Current News