- About
- Operations
- Rates
- Financials
- Procurement
- Human Resources
- News
- Employee Info
Protecting our environment is an important responsibility to the Guam Power Authority. We are governed by and compy with the following:
CLEAN AIR ACT
1. Prevention of Significant Deterioration (PSD)
- Annual Emission Testing
- Continuous Emissions Monitoring System (CEMS) – including Relative Accuracy Test Audit (RATA Testing) and Cylinder Gas Audit (CGA)
- Annual Emission Inventory / Fees
- New Source Performance Standards (NSPS Reporting)
- CPAICS (Fuel Switching)
- Cabras-Piti Area, Intermittent Control Strategy [40 CFR 69.11 and 69.12]
- Establishes the rules and procedures governing the regulation of fuel switching at the Cabras Power Plant and Piti Power Plant.
- Fuel Switching requirements are implemented. In compliance with all reporting requirements.
- Quarterly Reports are sent to U.S. EPA and must be postmarked/mailed within 30 days of the end of the Quarter
- Title V Air Permit Program
CLEAN WATER ACT
1. Cabras NPDES Permit Compliance
- 316(b) Study Phase I
- 316(b) Study Phase II
- Effluent Discharge Monitoring
- Discharge Monitoring Report (DMR)
- Toxicity Testing
- Best Management Plan (BMP)
- Annual Chemical Usage Report
- Revision of SPCC Plans to comply with changes in regulations
- Emergency Spill Response Program in place – Response to any spill within one hour
- Facility Response Plan
RESOURCE CONSERVATION & RECOVERY ACT (RCRA) “RiCRA”
1. Solid/Hazardous Waste Management Program
2. Used Oil Recycling Act
TOXIC SUBSTANCE CONTROL ACT (TSCA) “TaSCA”
1. PCB Management Program
2. Asbestos Operation and Maintenance (O&M) Plan
ENVIRONMENTAL PLANNING AND COMMUNITY RIGHT-TO-KNOW ACT (EPCRA)
Annual Chemical Inventory/Usage and Reporting Requirements – annual Toxic Release Inventory Report (TRI) COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT (CERCLA and SUPERFUND) Oil spill emergency response and clean-up for all GPA facilities and islandwide.
CRITICAL ENVIRONMENTAL COMPLIANCE ACTIVITIES
- Unilateral Administrative Order For Piti Tank Farm - USEPA Docket CWA-9-2001-001 – Life extension and upgrade of Tanks 1934 and 1935 plus Oil/Water Separator.
- Consent Decree Civil No. 97-00030 (Fuel Switching) - Cabras/Piti Intermittent Control Strategy
- Tanguisson Pipeline Maintenance - Tanguisson Pipeline inspections, repairs, upgrade of pipeline, pipeline supports, rectifiers, etc. Repair and upgrade of pipeline is ongoing.
TRAINING
- Spill Prevention Control & Countermeasure Plan (SPCC)
- Best Management Practice (BMP)
- Facility Response Plan (FRP)
- Hazardous Waste Operation (HAZWOPER)
2005 - TOTAL CLASSES HELD - 1
January 15, 2005 - Download 9.18 kb pdf
2006 - TOTAL CLASSES HELD - 6
March 28, 2006 - Download 9.52 kb pdf
March 29, 2006 - Download 9.44 kb pdf
March 31, 2006 - Download 9.19 kb pdf
May 1, 2006 - Download 9.22 kb pdf
May 2, 2006 - Download 9.24 kb pdf
May4, 2006 - Download 9.27 kb pdf
2008 - TOTAL CLASSES HELD - 9
March 29, 2008 - Download 13 kb pdf
May 27, 2008 - Download 13 kb pdf
May 30, 2008 - Download 940 kb pdf
June 4, 2008 - Download 219 kb pdf
June 18, 2008 - Download 942 kb pdf
July 15, 2008 - Download 229 kb pdf
July 29, 2008 - Download 611 kb pdf
August 12, 2008 - Download 13 kb pdf
August 26, 2008 - Download 240 kb pdf
2009 - TOTAL CLASSES HELD - 8
August 3, 2009 - Download 80.5 kb pdf Picture 244kb pdf
August 11, 2009 - Download 11.1 kb pdf
August 18, 2009 - Download 11.7 kb pdf Picture 245 kb pdf
August 25, 2009 - Download 11.6 kb pdf Picture 273 kb pdf
September 1, 2009 - Download 11.1 kb pdf Picture 234 kb pdf
September 8, 2009 - Download 11.4 kb pdf Picture 288 kb pdf
October 15, 2009 - Download 11 kb pdf
October 28, 2009 - Download 10.7 kb pdf
2011 - TOTAL CLASSES HELD - 6
July 6, 2011 - Download 77.4 kb pdf
November 8, 2011 - Download 82.5 kb pdf Picture 405 kb pdf
November 10, 2011 - Download 81.3 kb pdf Picture 245 kb pdf
November 29, 2011 - Download 82.4 kb pdf Picture 493 kb pdf
December 6, 2011 - Download 81.6 kb pdf
December 21, 2011 - Download 80.4 kb pdf
2012 - TOTAL CLASSES HELD - 8
November 13, 2012 - Download 83.7 kb pdf Picture 284 kb pdf
November 15, 2012 - Download 82.2 kb pdf Picture 260 kb pdf
November 16, 2012 - Download 83.4 kb pdf Picture 264 kb pdf
November 30, 2012 - Download 84.2 kb pdf Picture 247 kb pdf
December 5, 2012 - Download 80.3 kb pdf Picture 215 kb pdf
December 6, 2012 - Download 81.6 kb pdf Picture 262 kb pdf
December 11, 2012 - Download 82.8 kb pdf Picture 261 kb pdf
December 19, 2012 - Download 80.4 kb pdf Picture 291 kb pdf
December 27, 2012 - Download 78.9 kb pdf
Future PlanningGPA is working hard to insure a bright future for the people of Guam in several areas.
Find out More




